invoicAR

Contractor / construction invoice template

Construction contractor invoice template: running bills, stage payments, retention, materials and GST on works contracts. Free and PDF-ready.

  • Pre-filled with typical line items you can edit
  • GST/VAT, UPI QR and payment links built in
  • Download PDF or send on WhatsApp. No signup.
Your Studio
402, Lotus Business Park
Mumbai, Maharashtra, 400069
GSTIN: 27AAPFU0939F1ZV
hello@yourstudio.in
Tax Invoice
Invoice no.
INV-0042
Issue date
14 Oct 2026
Due date
29 Oct 2026
Place of supply
Karnataka (29)
Bill to
Nimbus Labs Pvt Ltd
Bengaluru, Karnataka
GSTIN: 29AAGCN1234M1Z2
#DescriptionHSN/SACQtyRateTaxAmount
1
RCC slab work
RA Bill 3, first floor slab
9954111,200 sq ft₹180.0018%₹2,16,000.00
2
Brickwork
230 mm walls, first floor
99541135 cu m₹6,500.0018%₹2,27,500.00
3
Wall and floor tiling
995474850 sq ft₹55.0018%₹46,750.00
4
Interior painting
Two coats emulsion over putty
9954732,400 sq ft₹18.0018%₹43,200.00
Amount in words
Rupees Six Lakh Twenty-Nine Thousand Four Hundred Seventy-One Only
Tax payable on reverse charge: No
Subtotal₹5,33,450.00
IGST @ 18%₹96,021.00
Total₹6,29,471.00
Payment details
UPI ID: yourstudio@okhdfcbank
HDFC Bank · A/c 50100123456789 · IFSC HDFC0001234
Notes
Thank you for your business!
Terms
Payment due within 15 days.
For Your Studio
Authorised Signatory
This is a computer-generated invoice.

How to invoice as a contractor / construction

Construction work is billed as running account (RA) bills: each bill shows work completed in the period, measured against the quoted rates, with cumulative totals to date. A good contractor invoice lists the work item, unit (sq ft, cubic metre, running metre), quantity done this period and the rate from the agreed quote or BOQ.

Clients often hold back a retention amount (commonly 5-10%) until the defects liability period ends. Show retention and any advances recovered as deductions so the net amount payable is clear, and keep a running record so the final bill reconciles.

Most construction contracts where you supply both labour and materials are works contracts, generally taxed at 18% GST, with lower rates for some government and affordable housing work. Construction of residential buildings is under SAC 995411; finishing trades have their own codes, such as 995473 for painting and 995474 for floor and wall tiling. Ask your CA to confirm the rate that applies to your contract.

Typical line items

ItemQtyExample rateSAC/HSN
RCC slab work
RA Bill 3, first floor slab
1200 sq ft₹180995411
Brickwork
230 mm walls, first floor
35 cu m₹6,500995411
Wall and floor tiling850 sq ft₹55995474
Interior painting
Two coats emulsion over putty
2400 sq ft₹18995473

Tips to get paid faster

  • Number RA bills in sequence and show cumulative work to date.
  • Use the same units and rates as the quote or BOQ.
  • Show retention and advance recovery as deductions.
  • Attach measurement sheets signed by the client or engineer.
  • Expect TDS on contract payments from business clients and track it.

Frequently asked questions

What GST rate applies to construction contracts?+

Works contracts (labour plus materials) are generally taxed at 18%. Some government, affordable housing and specified projects have lower rates. Confirm the applicable entry with your CA.

What is a running account bill?+

An interim invoice for work completed in a period, measured against agreed rates. Each RA bill shows quantities this period and cumulative totals.

How do I show retention on an invoice?+

Calculate the retention percentage on the bill value and show it as a deduction before the net amount payable. Track it so you can bill it at the end of the defects period.